ID |
Title |
Effective Date |
|
Agency level documents applying to all of this agency's boards |
7145
|
Manual for Processing Requests Pursuant to the Virginia Freedom of Information Act
|
10/24/2024 |
|
7146
|
E-Signature Guidance
|
12/1/2021 |
|
CEM-07
|
Civil Enforcement Manual - Chapter 4 - Civil Charges and Civil Penalties
|
12/31/2021 |
|
PREP-2017-01
|
Pollution Response Program - Base Manual
|
7/18/2017 |
|
PREP-2021-01
|
Transportation Incident Management Annex (TIM) – Interim Plan, GUIDANCE DOCUMENT: PREP-2021-01
|
4/28/2022 |
|
BOARD: Virginia Waste Management Board |
5804
|
Groundwater Monitoring Well Abandonment (Site Assessment)
*
|
7/23/2015 |
|
GM14-2006
|
VPA and Solid Waste Management Permitting and BUD Approval at Solid Waste Management Facilities
*
|
4/30/2014 |
|
LPR 03-2004
|
Waste Division Review of Environmental Review Reports as Required by NEPA
|
5/25/2004 |
|
LPR 16-2002
|
Guidance for Certification of Waste Oil Burning Equipment for the State Income Tax Credit
|
8/1/2002 |
|
LPR-2020-01
|
Guidance for the Certification of Recycling Machinery and Equipment for State Income Tax Credit (rev. 2021)
|
3/19/2021 |
|
LPR-HW-01-1997
|
Discarded Sandblast Grit Policy
*
|
2/14/1997 |
|
LPR-HW-01-2012
|
"Contained-in" and "Contained-out" Policy Guidance for Soils Contaminated with Hazardous Waste
*
|
7/9/2012 |
|
LPR-REM-01-1995
|
Policy for Handling Investigation Derived Waste
*
|
9/1/2003 |
|
LPR-REM-04-1996
|
Addendum to Policy for Handling Investigation Derived Waste
*
|
7/24/1996 |
|
LPR-REM-RA SW
|
Solid Waste Risk Assessment Guidance
*
|
10/10/2012 |
|
LPR-SW-01-1994
|
Gas Condensate Recirculation
*
|
11/1/2002 |
|
LPR-SW-01-2005
|
Guidance for Soil Analysis Required for Facilities Treating Petroleum Contaminated Soil Under the Provisions of 9 VAC 20-80-360
*
|
3/11/2005 |
|
LPR-SW-01-2007
|
Vegetative Waste Burning at Closed Landfills
*
|
1/8/2007 |
|
LPR-SW-01-2007(2)
|
Post-Closure Care Termination Memo
*
|
4/30/2007 |
|
LPR-SW-01-2008
|
Surface Water Impacts at Solid Waste Landfills
*
|
2/22/2008 |
|
LPR-SW-01-2009
|
Scenarios Under Which A Part A Amendment Is Or Is Not Required
*
|
7/10/2018 |
|
LPR-SW-01-2011A
|
Implementation of the New Operations Manual Requirements
*
|
7/9/2012 |
|
LPR-SW-01-2012
|
Interpretive Guidance for Groundwater Well Replacement Actions at Solid Waste Landfills
*
|
2/3/2012 |
|
LPR-SW-02-1993
|
Seismic Impact Zone - Part A Requirements
*
|
11/1/2002 |
|
LPR-SW-02-1997
|
Activities on Closed Landfills
*
|
9/1/2003 |
|
LPR-SW-02-2007
|
Close Safely the Old 1205 Permitted Landfills
*
|
12/22/2011 |
|
LPR-SW-02-2008
|
Landfill Waste Disposal Limits
*
|
1/20/2009 |
|
LPR-SW-02-2009
|
On-Site Composting of Routine Animal Mortality
*
|
5/1/2009 |
|
LPR-SW-02-2010
|
Solid Waste Compliance Program Inspection Manual
*
|
12/2/2019 |
|
LPR-SW-02-2011
|
CROSSWALK COMPARISION 9VAC20-80 VERSUS 9VAC20-81
*
|
3/28/2011 |
|
LPR-SW-02-2012
|
Solid Waste Special Waste Disposal Requests
*
|
2/2/2012 |
|
LPR-SW-03-1997
|
Notice of Expansion for Category 2 and Category 3 Facilities
*
|
8/17/1997 |
|
LPR-SW-03-2001
|
Local Landfill Certification for Non-Captive Industrial Landfills
*
|
4/19/2001 |
|
LPR-SW-03-2003
|
Tax Certification for Pollution Control
|
6/18/2003 |
|
LPR-SW-03-2005
|
Siting and Groundwater Monitoring for Landfills and the Vicinity of Wetlands
*
|
8/17/2005 |
|
LPR-SW-03-2007
|
Management of Grit and Screenings
*
|
2/26/2007 |
|
LPR-SW-03-2009
|
On-Site Burial of Routine Animal Mortality
*
|
5/1/2009 |
|
LPR-SW-03-2011
|
CHANGES TO THE COMPOSTING PROVISIONS
*
|
3/28/2011 |
|
LPR-SW-03-2012
|
Implementation of VELAP Certification
*
|
3/27/2012 |
|
LPR-SW-04-1993
|
HELP Model - Leachate generation for tank design
*
|
6/1/2003 |
|
LPR-SW-04-2005
|
Sanitary Landfill Siting Relative to a Public Water Supply Intake or Reservoir
*
|
8/23/2005 |
|
LPR-SW-04-2011
|
Financial Assurance for Stockpiles of Materials for Beneficial Use or Other Uses
*
|
2/22/2013 |
|
LPR-SW-04-2012
|
Management and Reuse of Contaminated Media
*
|
7/17/2012 |
|
LPR-SW-05-2009
|
Research Development and Demonstration Plans
*
|
11/9/2009 |
|
LPR-SW-06-2001
|
Guidance on the Director's Determination in 10.1-1408.1.D.1 of the Code of Virginia - Permit by Rule Submissions
*
|
8/9/2001 |
|
LPR-SW-06-2005
|
Coordination of Permitting Requirements for Wetlands and the Siting of Solid Waste Landfills
*
|
8/22/2005 |
|
LPR-SW-06-2011
|
Amendment 7 and Phase I Monitoring
*
|
8/3/2011 |
|
LPR-SW-07-1996
|
Closure Documents - Survey Plat Guidance
*
|
8/6/1996 |
|
LPR-SW-07-2003
|
Permitting Guidance for the 10 Year Permit Review
*
|
8/27/2003 |
|
LPR-SW-08-1993
|
P. E. Certifications Required for Permit by Rules
*
|
10/1/1993 |
|
LPR-SW-09-2001
|
Management of Dredged Material
*
|
12/31/2001 |
|
LPR-SW-2013-01
|
Landfill Construction Oversight Inspections
*
|
6/3/2013 |
|
LPR-SW-2013-02
|
Landfill Mining Applicability and Application Requirements
*
|
9/27/2013 |
|
LPR-SW-2013-03
|
Waste Information Request and Trade Secret Protection
|
8/15/2013 |
|
LPR-SW-2014-01
|
Clarification of Required Final Cover Designs and Acceptable Alternate Designs
*
|
3/28/2014 |
|
LPR-SW-2015-01
|
Use of Mechanically Stabilized Earth (MSE) Berms in Landfill Design
*
|
4/24/2015 |
|
LPR-SW-2016-02
|
Permitting, Sampling, Analysis, and Data Reporting associated with Solid Waste Landfill Underdrain Systems
*
|
10/18/2016 |
|
LPR-SW-2017-01
|
Clarification of Landfill Gas Regulatory Requirements
*
|
9/5/2017 |
|
LPR-SW-2018-01
|
Frequently Asked Questions about Convenience Centers
*
|
12/14/2018 |
|
LPR-SW-2019-01
|
Odor Guidance for Solid Waste Management Facilities
*
|
11/14/2019 |
|
LPR-SW-2020-01
|
Managing Leachate in Compliance with the VSWMR
*
|
10/1/2020 |
|
LPR-SW-ACL
|
Use of Alternate Concentration Limits for Establishing Groundwater Protection Standards (GPS)
*
|
6/4/2013 |
|
LPR-SW-EE-160
|
Virginia Waste Tire Program - Standards for Use of Tire Chips in a Residential Septic Drainfield
|
8/1/1997 |
|
LPR-SW-EE-166
|
Virginia Waste Tire Program Utilization of Waste Tire Shred/Chips
|
8/1/2002 |
|
LPR-SW-SI-00
|
Submission Instructions - 2012 Revision Approval Memo
*
|
2/1/2012 |
|
LPR-SW-SI-01
|
Submission Instruction 01 - Procedural Requirements for a New or Modified Solid Waste Management Facility Application
*
|
2/1/2012 |
|
LPR-SW-SI-02
|
Submission Instruction 02 - Design Plans and Report for Solid Waste Disposal Faciilities
*
|
2/2/2012 |
|
LPR-SW-SI-03
|
Submission Instruction 03 - Design Plans and Report for Waste to Energy, Thermal Treatment, and Incineration Facilities
*
|
2/2/2012 |
|
LPR-SW-SI-04
|
Submission Instruction 04 - Design Plans and Report for Other Solid Waste Management Facilities
*
|
2/2/2012 |
|
LPR-SW-SI-06
|
Submission Instruction 06 - Closure and Post-Closure Plans
*
|
2/2/2012 |
|
LPR-SW-SI-07
|
Submission Instructions 07 - Leachate Management Plan for Solid Waste Management Facilties
*
|
2/1/2012 |
|
LPR-SW-SI-09
|
Submission Instruction 09 - Requirements for Financial Assurance Mechanisms
*
|
5/21/2002 |
|
LPR-SW-SI-10
|
Submission Instruction 10 - Procedural Requirements for Permits-By-Rule
*
|
2/1/2012 |
|
LPR-SW-SI-13
|
Submission Instruction 13 - Landfill Gas Management, Remediation, and Odor Plans for Solid Waste Disposal Facilities
*
|
8/31/2017 |
|
LPR-SW-SI-15
|
Submission Instruction 15 - Groundwater Nature and Extent Studies at Solid Waste Landfills
*
|
1/31/2012 |
|
LPR-SW-SI-16
|
Submission Instruction 16 - Assessment of Corrective Measures for Groundwater at Solid Waste Landfills
*
|
1/31/2012 |
|
LPR-SW-SI-17
|
Submission Instruction 17 - Corrective Action Plan
*
|
12/11/2013 |
|
LPR-SW-SI-18
|
Submission Instruction 18 - Proposal for Presumptive Remedies
*
|
1/31/2012 |
|
LPR-SW-SI-19
|
Submission Instruction 19 - Alternate Source Demonstrations
*
|
2/3/2012 |
|
LPR-SW-SI-20
|
Submission Instruction 20 - Termination of Post-Closure Activity Evaluation
*
|
12/10/2013 |
|
LPR-SW-SI-21
|
Submission Instruction 21 - Monitored Natural Attenuation
*
|
9/22/2004 |
|
LPR-SW-SI-22
|
Submission Instructions 22 - Groundwater Alternate Point of Compliance Variance Petitions
*
|
12/16/2011 |
|
LPR-SW-SI-23
|
Submission Instructions 23 - Groundwater Annual Reports
*
|
12/16/2011 |
|
LPR-SW-SI-24
|
Submission Instructions 24 - Groundwater Semi-Annual and Quarterly Monitoring Reports
*
|
12/16/2011 |
|
LPR-SW-SI-25
|
Submission Instructions for MNA-based CASE Reports at Solid Waste Landfills
*
|
7/13/2012 |
|
LPR-SW-SI-26
|
Submission Instructions for Groundwater Pump & Treat Based CASE Reports at Solid Waste Landfills
*
|
7/13/2012 |
|
LPR-SW-SI-27
|
Submission Instruction 27 - Landfill Mining Operating Plans for Solid Waste Disposal Facilities
*
|
9/30/2013 |
|
LPR-SW-SI-28
|
Submission Instructions 28 - Submission Instruction for Applying Site-Specific Alternate
*
|
6/16/2015 |
|
LPR-SW-SI-29
|
Submission Instruction No. 29: Additional Permit Application Requirements for Coal Combustion Residuals Units
*
|
12/5/2016 |
|
 |
|
|
|