Search Options
Symbol Legend
Proposed change submitted for Governor's Office review
Forum not yet submitted for publication
Forum submitted for publication, but not yet open
Forum is open for comments
Forum closed, changes not yet updated by the agency
Department of Environmental Quality
Air Pollution Control Board
89 guidance documents
relevant to this
chapter
for the criteria specified
ID |
Title |
Effective Date |
|
Agency level documents applying to all of this agency's boards |
6378
|
Virginia Environmental Excellence Program Operations Manual
|
2/18/2021 |
|
7145
|
Manual for Processing Requests Pursuant to the Virginia Freedom of Information Act
|
12/19/2022 |
|
7146
|
E-Signature Guidance
|
12/1/2021 |
|
CEM-07
|
Civil Enforcement Manual - Chapter 4 - Civil Charges and Civil Penalties
|
12/31/2021 |
|
PREP-2017-01
|
Pollution Response Program - Base Manual
|
7/18/2017 |
|
PREP-2021-01
|
Transportation Incident Management Annex (TIM) – Interim Plan, GUIDANCE DOCUMENT: PREP-2021-01
|
4/28/2022 |
|
BOARD: Air Pollution Control Board |
4186
|
Memorandum of Agreement Between the Department of Mines, Minerals and Energy and the Department of Environmental Quality
|
2/19/2010 |
|
4455
|
Fugitive Dust Control from Mining Operations
|
6/9/2011 |
|
00-2016
|
Chain of Custody Policy and Procedures - Amendment 1
|
3/14/2006 |
|
ACG-005
|
Guidance for the Interpretation of the Duration of Violations when Applying Criteria 2, 3, and 4 of EPA's 2014 Policy for High Priority Violations
|
5/13/2016 |
|
ACG-014
|
Air Compliance Guidance for Violations of 9 VAC 5 Chapter 40 Part II Article 37 and Related Federal Rules in Accordance with EPA Letters regarding No Action Assurance dated September 13, 2018.
|
9/24/2018 |
|
APG-101
|
Interim Guidance, Shell Buildings
|
1/30/1987 |
|
APG-102
|
Public Participation Requirements prior to issuing any permit for the construction of a new major stationary source or major modification to an existing source pursuant to Section 10.1-1307.01 (Localities Particularly Affected) (Memo No. 99-1004)
|
1/25/2010 |
|
APG-103
|
Guidance on Permit Applicability - PM and PM-10 Sources (Memo No. 01-1002)
|
9/14/2009 |
|
APG-105
|
Procedures for Shutting Down Sources (Memo No. 03-1006)
|
8/19/2010 |
|
APG-110
|
Air Permit Guidance for Condensable Emissions in Particulate Pollutants
*
|
11/12/2020 |
|
APG-150
|
Air Permit Application Fee Guidance
|
1/1/2022 |
|
APG-200A
|
Title V Air Permits Guidance Manual
|
4/16/2020 |
|
APG-202
|
EPA's White Papers on Title V Operating Permit Program (Memo No. 97-1004)
|
8/19/1997 |
|
APG-203
|
Utilization of the Wood Furniture Manufacturing Title V Permit Boilerplate (Memo No. 98-1001)
|
2/17/1998 |
|
APG-204
|
Common Control Determinations for Title V Permit Applicability (Memo No. 98-1002)
|
1/25/2010 |
|
APG-206
|
Existing Source Startup, Shutdown, and Malfunction Opacity Exclusion for Title V Permits
|
3/16/2009 |
|
APG-213
|
Sample MACT Place Holder Conditions
|
3/5/2004 |
|
APG-214
|
T5 NSR Conflicts
|
9/30/2004 |
|
APG-301
|
Memorandum of understanding between Shenandoah National Park and Commonwealth of Virginia regarding PSD permitting issues
|
3/31/1993 |
|
APG-302
|
Memorandum of understanding between Jefferson National Forest and Commonwealth of Virginia Regarding PSD Permitting Issues
|
3/30/1993 |
|
APG-303
|
PSD Definitions
|
9/14/2009 |
|
APG-304
|
Interpretation of the term "designed to accommodate"
|
9/14/2009 |
|
APG-306
|
Relocation of Portable Non-diesel Engines
|
10/25/2002 |
|
APG-311
|
Interim Guidance on Prevention of Significant Deterioration (PSD)
|
8/25/2014 |
|
APG-350
|
New Source Review Permits Program Manual
|
11/12/2020 |
|
APG-350A
|
Article 6 - Minor New Source Review Permit Program Manual, Draft
|
11/12/2020 |
|
APG-355
|
Used Oil Fuel Permitting
|
7/11/2013 |
|
APG-400A
|
State Operation Permits Manual
|
9/30/1999 |
|
APG-452
|
Section 112(g) Implementation Guidance (Policy No. 99-1007)
|
1/25/2010 |
|
APG-453
|
Implementation Guidance for Incorporating State Toxics Requirements in Air Permits (Memo No. 02-1001)
|
1/20/2010 |
|
APG-456
|
Regulation of Federal HAPs Under the State Toxics Program and State NSR Programs
|
9/1/2004 |
|
APG-551
|
Procedures for Permitting and other Activities Associated with Coal Processing Plants (ADP Statement No. 2-96)
|
9/18/2008 |
|
APG-553A
|
Municipal Solid Waste Landfill Procedures and Boilerplate Permits
|
9/1/1999 |
|
APG-554
|
Permitting and Compliance Issues for Non-road Internal Combustion Engines
|
12/1/1999 |
|
APG-554A
|
Internal Combustion Engine
|
12/1/1999 |
|
APG-560
|
Wood Fired Boiler Procedure for Writing New and Modified Permits
|
8/14/1998 |
|
APG-561
|
Residual Oil Procedure for Writing New and Modified Permits for Boilers
|
9/17/1998 |
|
APG-562
|
Natural Gas and Distillate Oil Procedure for Writing New and Modified Permits for Boilers
|
7/16/2018 |
|
APG-563
|
Wood Coating Procedure for Writing New and Modified Permits
|
11/5/1998 |
|
APG-564
|
Wood Working Procedure for Writing New and Modified Permits
|
11/5/1998 |
|
APG-568
|
Printing Procedure for Writing New and Modified Permits
|
8/10/2000 |
|
APG-570
|
Interim Guidance for Permit Applicability for Emergency Generators Participating in an Emergency Load Response Program
|
5/15/2009 |
|
APG-573
|
Lumber Kiln Emissions Calculatios
|
9/30/2010 |
|
APG-574
|
Exemption of Qualified Fumigation Facilities
|
7/11/2013 |
|
AQAG-001
|
Virginia Modeling Guideline for Air Quality Permits
|
7/24/2012 |
|
AQM-001
|
Quality Assurance Project Plan for the Ozone Ambient Air Monitoring Program
*
|
11/1/2011 |
|
AQM-002
|
PM 10 Sampler Standard Operating Procedure (SOP)
*
|
4/14/2009 |
|
AQM-003
|
Quality Assurance Project Plan for the PM2.5 Ambient Air Monitoring Program
*
|
11/1/1998 |
|
AQM-004
|
Quality Assurance Project Plan for the Carbon Monoxide Ambient Air Monitoring Program
*
|
12/1/2011 |
|
AQM-004A
|
Quality Assurance Project Plan for the Carbon Monoxide Ambient Air Monitoring Program - Appendices
*
|
12/1/2011 |
|
AQM-005
|
Quality Assurance Project Plan for the Nitrogen Oxides Ambient Air Monitoring Program
*
|
12/6/2011 |
|
AQM-005A
|
Quality Assurance Project Plan for the Nitrogen Oxides Ambient Air Monitoring Program - Appendices
*
|
12/6/2011 |
|
AQM-006
|
Quality Assurance Project Plan for the Sulfur Dioxide Ambient Air Monitoring Program
*
|
12/6/2011 |
|
AQM-006A
|
Quality Assurance Project Plan for the Sulfur Dioxide Ambient Air Monitoring Program - Appendices
*
|
12/6/2011 |
|
AQM-007
|
Quality Assurance Project Plan for Lead-TSP Ambient Air Monitoring Program
*
|
4/25/2014 |
|
AQM-007A
|
Quality Assurance Project Plan for Lead-TSP Ambient Air Monitoring Program - Appendices
*
|
4/25/2014 |
|
AQP-01
|
Procedures for Testing Facilities Subject to Emission Standards for Volatile Organic Compounds
|
7/1/1991 |
|
AQP-02
|
Procedures for Determining Compliance with Volatile Organic Compound Emission Standards Covering Surface Coating Operations
|
7/1/1991 |
|
AQP-03
|
Procedures for the Measurement of Capture Efficiency for Determining Compliance with Volatile Organic Compound Emission Standards Covering Surface Coating Operations and Graphic Arts Printing Processes
|
4/1/1996 |
|
AQP-04
|
Procedures for Maintaining Records for Surface Coating Operations and Graphic Arts Printing Processes
|
7/1/1991 |
|
AQP-08
|
Procedures for Preparing and Submitting Emission Statements for Stationary Sources
|
1/1/1993 |
|
AQP-09
|
Procedures for Implementation of Regulations Covering Stage II Vapor Recovery Systems for Gasoline Dispensing Facilities
|
1/1/1993 |
|
AQP-09A
|
Guidance Memo - Stage I and II Vapor Recovery System Testing Standards
|
12/15/2011 |
|
AQP-11
|
Implementation of the Prevention of Significant Deterioration (PSD) of Air Quality Program
|
1/1/1993 |
|
AQP-14
|
Control Technology Requirements for Emissions of NOx from Electric Generating Combined Cycle Turbines
|
12/1/2002 |
|
ASOP-01
|
Complaints
|
8/9/2001 |
|
ASOP-02
|
Inspections
|
9/14/2001 |
|
ASOP-03
|
Visible Emissions Evaluations
|
3/20/2003 |
|
ASOP-04
|
CEM Audit Evaluation
|
3/19/2003 |
|
ASOP-06
|
Title V Report/Certification Evaluations
|
6/30/2018 |
|
ASOP-07
|
VOC Testing
|
10/23/1997 |
|
ASOP-08
|
Particulate Testing: Role of Agency Observer
|
5/26/1998 |
|
ASOP-09
|
VOC Sampling and Analysis
|
3/28/2002 |
|
ASOP-11
|
The NOx Trading Program
|
6/6/2003 |
|
ASOP-13
|
Tax Certifications
|
11/22/2004 |
|
ASOP-13 Amendment
|
Tax Certification
|
1/23/2009 |
|
ASOP-17
|
Compliance Assistance
|
9/23/2003 |
|
SBAP-01
|
Small Business Assistance Program Modification Procedures for Modification of Work Practices, Technical Methods or Time Frame
|
10/28/1994 |
|
SBAP-02
|
Guide to Compliance Requirements for Dry Cleaners
|
3/17/1994 |
|
SBAP-03
|
Fact Sheet - Wood Furniture Operations
|
12/13/1996 |
|
SBAP-04
|
Fact Sheet - Lithographic Printing Processes
|
7/1/1996 |
|
SBAP-05
|
Fact Sheet - Flexographic, Rotogravure, and Publication Rotogravure Printing Lines
|
7/1/1996 |
|
SBAP-06
|
Fact Sheet - Small Business Assistance Program
|
12/17/1997 |
|
|
|
|
|