Virginia Regulatory Town Hall

Final Text

highlight

Action:
Final Exempt CH 890 Changes in Response to 2022 Board Bill
Stage: Final
 
9VAC25-890-1 Definitions

The words and terms used in this chapter shall have the meanings defined in the Virginia Stormwater Management Act (Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia) and 9VAC25-870 unless the context clearly indicates otherwise, except that for the purposes of this chapter:

"Board" means the State Water Control Board. When used outside the context of the promulgation of regulations, including regulations to establish general permits, "board" means the Department of Environmental Quality.

"Date brought online" means the date when the permittee determines that a new stormwater management facility is properly functioning.

"Department" means the Department of Environmental Quality.

"High-priority facilities" means facilities owned or operated by the permittee that actively engage in one or more of the following activities: (i) composting, (ii) equipment storage and maintenance, (iii) materials storage, (iv) pesticide storage, (v) storage for public works, (vi) recycling, (vii) salt storage , (viii) solid waste handling and transfer, and (ix) vehicle storage and maintenance.

"MS4 regulated service area" or "service area" means for Phase II permittees, the drainage area served by the permittee's MS4 that is located within an urbanized area as determined by the 2010 decennial census performed by the Bureau of the Census. MS4 regulated service area may also be referred to as "served by the MS4" as it pertains to the tables in Part II A of this permit.

"Physically interconnected" means that one MS4 is connected to a second MS4 in such a manner that it allows for direct discharges to the second system.

"Pollutants of concern" or "POC" means pollutants specifically identified in a U.S. Environmental Protection Agency approved total maximum daily load (TMDL) report as causing a water quality impairment.

9VAC25-890-10 Purpose; delegation of authority; effective date of the state permit

A. This general permit regulation governs point source stormwater discharges from regulated small municipal separate storm sewer systems (small MS4s) to surface waters of the Commonwealth of Virginia. Nonmunicipal stormwater or wastewater discharges are not authorized by this permit except in accordance with 9VAC25-890-20 D.

B. This general permit will become effective on November 1, 2018 and will expire October 31, 2023.

C. The Director of the Department of Environmental Quality, or his designee, may perform any act of the board provided under this chapter, except as limited by § 62.1-44.14 of the Code of Virginia.