Virginia Regulatory Town Hall
 
Agency
Department of Conservation and Recreation
 
Board
Virginia Soil and Water Conservation Board
 
chapter
Stormwater Management Regulations AS 9 VAC 25-870 [4 VAC 50 ‑ 60]
Action Amend Parts I, II, and III of the Virginia Stormwater Management Program Permit Regulations to address water quality and quantity and local stormwater management program criteria.
Stage Proposed
Comment Period Ended on 8/21/2009
spacer
Previous Comment     Next Comment     Back to List of Comments
8/10/09  11:57 am
Commenter: Leonard Hughes

New Runoff Rules for Chesapeake Bay: comments
 
For the "Appomattox River Trail" program, restrict the road building and heavy equipment used to deliver wood and materials to the streams and rivers. Require manual labor to use foot trails to deliver materials. Reinstate the vegetation. Post signs for non-readers advising that the fish are contaminated.
Buffer zones or vegetation restrict runoff into the Appomattox River. and thereby runoff into the Chesapeake Bay.
The Appomattox River Trail program is destroying our environment. Every probe made to access the Appomattox River destroys the buffer zones. Roads are built right down to the water to allow heavy equipment to deliver wood to the river to build bridges and piers. Building these roads destroys the vegetation including bushes and trees.
 
Thank you,
 
Leonard Hughes
lnmnhughes@yahoo.com
3807 Kippax Drive
Hopewell, VA 23860
(804) 541-0869
CommentID: 9455