Department of Planning and BudgetAn official website of the Commonwealth of Virginia Here's how you knowAn official websiteHere's how you know

Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
 
Board
State Water Control Board
 
chapter
General VPDES Permit for Discharges of Stormwater from Construction Activities (formerly Part XIV, 4VAC50-60) [9 VAC 25 ‑ 880]
Action 25-880 - 2024 Amendment and Reissuance of the Existing General Permit Regulation - see action summary- extension of comment period
Stage Proposed
Comment Period Ended on 10/13/2023
spacer
Previous Comment     Next Comment     Back to List of Comments
10/13/23  12:57 pm
Commenter: Seva Iwinski

Options to meet numeric discharge limits
 

I work with engineers and erosion control professionals in Virginia. Many have expressed concern with meeting the proposed numeric dewatering discharge turbidity limits. The expressed concern is that they have a numeric discharge limit to meet but have no tools or direction as to how to meet these discharge limits. I am a proponent of environmental conservation and believe limits are needed and necessary as sediment is a significant pollutant and should not be discharged. Guidance should be provided in the permit for those conducting dewatering projects in VA on how to meet low numeric discharge limits. 