Final Text
Part I
Definitions and Applicability
9VAC15-40-10. Definitions.
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Applicant" means the owner or operator who submits an application to the department for a permit by rule pursuant to this chapter.
"Coastal Avian Protection Zones" or "CAPZ" means the areas designated on the map of "Coastal Avian Protection Zones" generated on the department's Coastal GEMS geospatial data system (9VAC15-40-120 C 1).
"Department" means the Department of Environmental Quality, its director, or the director's designee.
"DCR" means the Department of Conservation and Recreation.
"DGIF" means the Department of Game and Inland Fisheries.
"Disturbance zone" means the area within the site directly impacted by construction and operation of the wind energy project, and within 100 feet of the boundary of the directly impacted area.
"Ecological core" means an area of nonfragmented forest, marsh, dune, or beach of ecological importance that is at least 100 acres in size and identified in DCR's Natural Landscape Assessment web-based application (9VAC15-40-120 C 2).
"Historic resource" means any prehistoric or historic district, site, building, structure, object, or cultural landscape that is included or meets the criteria necessary for inclusion in the Virginia Landmarks Register pursuant to the authorities of § 10.1-2205 of the Code of Virginia and in accordance with 17VAC5-30-40 through 17VAC5-30-70.
"Important Bird Areas" means the designation of discrete sites by the National Audubon Society as having local, regional, continental, or global importance for birds because they support significant numbers of one or more high priority avian species (e.g., T&E, SGCN) during the breeding, wintering, or migration seasons.
"Interconnection point" means the point or points where the wind energy project connects to a project substation for transmission to the electrical grid.
"Invasive plant species" means non-native plant species that cause, or are likely to cause, economic or ecological harm or harm to human health as established by Presidential Executive Order 13112 (64 FR 6183, February 3, 1999) and contained on DCR's Invasive Alien Plant Species of Virginia (9VAC15-40-120 B 3).
"Migratory corridors" means major travel routes used by significant numbers of birds during biannual migrations between breeding and wintering grounds.
"Migratory staging areas" means those sites along migratory corridors where significant numbers of birds stop to feed and rest during biannual migrations between breeding and wintering grounds that are essential to successful migration.
"Natural heritage resource" means the habitat of rare, threatened, or endangered plant and animal species, rare or state significant natural communities or geologic sites, and similar features of scientific interest benefiting the welfare of the citizens of the Commonwealth.
"Nearshore waters" means all tidal waters within the Commonwealth of Virginia and seaward of the mean low-water shoreline to three nautical miles offshore in the Atlantic Ocean.
"Operator" means the person responsible for the overall operation and management of a wind energy project.
"Other avian mitigation factors" means Important Bird Areas, migratory corridors, migratory staging areas, and wintering areas within the Coastal Avian Protection Zones.
"Owner" means the person who owns all or a portion of a wind energy project.
"Permit by rule" means provisions of the regulations stating that a project or activity is deemed to have a permit if it meets the requirements of the provision.
"Person" means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town, or other political subdivision of the Commonwealth, any interstate body, or any other legal entity.
"Phase of a project" means one continuous period of construction, startup, and testing activity of the wind energy project. A phase is deemed complete when 90 calendar days have elapsed since the last previous wind turbine has been placed in service, except when a delay has been caused by a significant force majeure event, in which case a phase is deemed complete when 180 calendar days have elapsed since the last previous wind turbine has been placed in service.
"Post-construction" means any time after the last turbine on the wind energy project or phase of that project has been placed in service.
"Pre-construction" means any time prior to commencing land-clearing operations necessary for the installation of energy-generating structures at the small wind energy project.
"Rated capacity" means the maximum capacity of a wind energy project based on the sum total of each turbine's nameplate capacity.
"SGCN" or "species of greatest conservation need" means any vertebrate species so designated by DGIF as Tier 1 or Tier 2 in the Virginia Wildlife Action Plan (9VAC15-40-120 B 6).
"Site" means the area containing a wind energy project that is under common ownership or operating control. Electrical infrastructure and other appurtenant structures up to the interconnection point shall be considered to be within the site.
"Small renewable energy project" means (i) an
electrical generation facility with a rated capacity not exceeding 100 150
megawatts that generates electricity only from sunlight, or wind,;
(ii) an electrical generation facility with a rated capacity not exceeding 100
megawatts that generates electricity only from falling water, wave motion,
tides, or geothermal power; or (ii) (iii) an electrical
generation facility with a rated capacity not exceeding 20 megawatts that
generates electricity only from biomass, energy from waste, or municipal solid
waste.
"Small wind energy project," "wind energy
project," or "project" means a small renewable energy project
that (i) generates electricity from wind, consisting of one or more wind
turbines and other accessory structures and buildings, including substations,
post-construction meteorological towers, electrical infrastructure, and other
appurtenant structures and facilities within the boundaries of the site; and
(ii) is designed for, or capable of, operation at a rated capacity equal to or
less than 100 150 megawatts. Two or more wind energy projects
otherwise spatially separated but under common ownership or operational
control, which are connected to the electrical grid under a single interconnection
agreement, shall be considered a single wind energy project. Nothing in this
definition shall imply that a permit by rule is required for the construction
of meteorological towers to determine the appropriateness of a site for the
development of a wind energy project.
"State-owned submerged lands" means lands that lie seaward of the mean low-water mark in tidal waters or that have an elevation below the ordinary mean high-water elevation in nontidal areas that are considered property of the Commonwealth pursuant to § 28.2-1200 of the Code of Virginia.
"T&E," "state threatened or endangered species," or "state-listed species" means any wildlife species designated as a Virginia endangered or threatened species by DGIF pursuant to §§ 29.1-563 through 29.1-570 of the Code of Virginia and 4VAC15-20-130.
"VLR" means the Virginia Landmarks Register (9VAC15-40-120 B 1).
"VLR-eligible" means those historic resources that meet the criteria necessary for inclusion on the VLR pursuant to 17VAC5-30-40 through 17VAC5-30-70 but are not listed in VLR.
"VLR-listed" means those historic resources that have been listed in the VLR in accordance with the criteria of 17VAC5-30-40 through 17VAC5-30-70.
"VMRC" means the Virginia Marine Resources Commission.
"Wildlife" means wild animals; except, however, that T&E insect species shall only be addressed as part of natural heritage resources and shall not be considered T&E wildlife.
"Wintering areas" means those sites where a significant portion of the rangewide population of one or more avian species overwinter annually.
9VAC15-40-20. Authority and applicability.
This regulation is issued under authority of Article 5
(§ 10.1-1197.5 et seq.) of Chapter 11.1 of Title 10.1 of the Code of
Virginia. The regulation contains requirements for wind-powered electric generation
projects consisting of wind turbines and associated facilities with a single
interconnection to the electrical grid that are designed for, or capable of,
operation at a rated capacity equal to or less than 100 150 megawatts.
The department has determined that a permit by rule is required for small wind
energy projects with a rated capacity greater than five megawatts, and
this regulation contains the permit by rule provisions for these projects in
Part II (9VAC15-40-30 et seq.) of this chapter. The department has also
determined that a permit by rule is not required for small wind energy projects
with a rated capacity of five megawatts or less, and this regulation
contains notification and other provisions for these projects in Part III
(9VAC15-40-130) of this chapter. Projects that meet the criteria in Part III of
this chapter are deemed to be covered by the permit by rule.
Part II
Permit by Rule Provisions
9VAC15-40-30. Application for permit by rule for wind energy projects.
A. The owner or operator of a small wind energy project with a
rated capacity greater than 5 five megawatts shall submit to the department
a complete application, in which he satisfactorily accomplishes all of the
following:
1. In accordance with § 10.1-1197.6 B 1 of the Code of Virginia, and as early in the project development process as practicable, furnishes to the department a notice of intent, to be published in the Virginia Register, that he intends to submit the necessary documentation for a permit by rule for a small renewable energy project;
2. In accordance with § 10.1-1197.6 B 2 of the Code of Virginia, furnishes to the department a certification by the governing body of the locality or localities wherein the small renewable energy project will be located that the project complies with all applicable land use ordinances;
3. In accordance with § 10.1-1197.6 B 3 of the Code of Virginia, furnishes to the department copies of all interconnection studies undertaken by the regional transmission organization or transmission owner, or both, on behalf of the small renewable energy project;
4. In accordance with § 10.1-1197.6 B 4 of the Code of Virginia, furnishes to the department a copy of the final interconnection agreement between the small renewable energy project and the regional transmission organization or transmission owner indicating that the connection of the small renewable energy project will not cause a reliability problem for the system. If the final agreement is not available, the most recent interconnection study shall be sufficient for the purposes of this section. When a final interconnection agreement is complete, it shall be provided to the department. The department shall forward a copy of the agreement or study to the State Corporation Commission;
5. In accordance with § 10.1-1197.6 B 5 of the Code of
Virginia, furnishes to the department a certification signed by a professional
engineer licensed in Virginia that the maximum generation capacity of the small
wind energy project, as designed, does not exceed 100 150
megawatts;
6. In accordance with § 10.1-1197.6 B 6 of the Code of Virginia, furnishes to the department an analysis of potential environmental impacts of the small renewable energy project's operations on attainment of national ambient air quality standards;
7. In accordance with § 10.1-1197.6 B 7 of the Code of Virginia, furnishes to the department, where relevant, an analysis of the beneficial and adverse impacts of the proposed project on natural resources. The owner or operator shall perform the analyses prescribed in 9VAC15-40-40. For wildlife, that analysis shall be based on information on the presence, activity, and migratory behavior of wildlife to be collected at the site for a period of time dictated by the site conditions and biology of the wildlife being studied, not exceeding 12 months;
8. In accordance with § 10.1-1197.6 B 8 of the Code of
Virginia, furnishes to the department a mitigation plan pursuant to
9VAC15-40-60 that details reasonable actions to be taken by the owner or
operator to avoid, minimize, or otherwise mitigate such impacts, and to measure
the efficacy of those actions; provided, however, that the provisions of 9VAC15-40-30
A 8 this subdivision shall only be required if the department
determines, pursuant to 9VAC15-40-50, that the information collected pursuant
to § 10.1-1197.6 B 7 of the Code of Virginia and 9VAC15-40-40 indicates
that significant adverse impacts to wildlife or historic resources are likely.
The mitigation plan shall be an addendum to the operating plan of the wind
energy project, and the owner or operator shall implement the mitigation plan
as deemed complete and adequate by the department. The mitigation plan shall be
an enforceable part of the permit by rule;
9. In accordance with § 10.1-1197.6 B 9 of the Code of Virginia, furnishes to the department a certification signed by a professional engineer licensed in Virginia that the project is designed in accordance with 9VAC15-40-80;
10. In accordance with § 10.1-1197.6 B 10 of the Code of Virginia, furnishes to the department an operating plan that includes a description of how the project will be operated in compliance with its mitigation plan, if such a mitigation plan is required pursuant to 9VAC15-40-50;
11. In accordance with § 10.1-1197.6 B 11 of the Code of Virginia, furnishes to the department a detailed site plan meeting the requirements of 9VAC15-40-70;
12. In accordance with § 10.1-1197.6 B 12 of the Code of Virginia, furnishes to the department a certification signed by the applicant that the small wind energy project has applied for or obtained all necessary environmental permits;
13. In accordance with § 10.1-1197.6 H and I of the Code of Virginia, furnishes to the department a certification signed by the applicant that the small wind energy project is being proposed, developed, constructed, or purchased by a person that is not a utility regulated pursuant to Title 56 of the Code of Virginia or provides certification that (i) the project's costs are not recovered from Virginia jurisdictional customers under base rates, a fuel factor charge, or a rate adjustment clause or (ii) the applicant is a utility aggregation cooperative formed under Article 2 (§ 56-231.38 et seq.) of Chapter 9.1 of Title 56 of the Code of Virginia.
14. Prior to authorization of the project and in
accordance with §§ 10.1-1197.6 B 13 and 10.1-1197.6 B 14 of the
Code of Virginia, conducts a 30-day public review and comment period and holds
a public meeting pursuant to 9VAC15-40-90. The public meeting shall be held in
the locality or, if the project is located in more than one locality, in a
place proximate to the location of the proposed project; however, for projects
located in nearshore waters or on state-owned submerged lands, the meeting
shall be held in the locality that is the closest distance from the approximate
center of the project's disturbance zone. Following the public meeting and
public comment period, the applicant shall prepare a report summarizing the
issues raised by the public and include any written comments received and the
applicant's response to those comments. The report shall be provided to the
department as part of this application; and
14. 15. In accordance with 9VAC15-40-110,
furnishes to the department the appropriate fee.
B. Within 90 days of receiving all of the required documents and fees listed in subsection A of this section, the department shall determine, after consultation with other agencies in the Secretariat of Natural Resources, whether the application is complete and whether it adequately meets the requirements of this chapter, pursuant to § 10.1-1197.7 A of the Code of Virginia.
1. If the department determines that the application meets the requirements of this chapter, then the department shall notify the applicant in writing that he is authorized to construct and operate a small wind energy project pursuant to this chapter.
2. If the department determines that the application does not meet the requirements of this chapter, then the department shall notify the applicant in writing and specify the deficiencies.
3. If the applicant chooses to correct deficiencies in a previously submitted application, the department shall follow the procedures of this subsection and notify the applicant whether the revised application meets the requirements of this chapter within 60 days of receiving the revised application.
4. Any case decision by the department pursuant to this subsection shall be subject to the process and appeal provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).