Virginia Regulatory Town Hall
Agency
Department of Energy
Guidance Document Information
Title DMLR Procedure No. 3.3.17 Tree Planting
Document ID DMLR-P-3.3.17
Summary Procedure to ensure the permittee plants the required trees and shrubs in accordance with the approved detailed plans as contemporaneously as practical in order to initiate the post mining land use for each area of the permit in which the inspector has approved regrading.
Effective Date 8/30/2005
pdf View document text     Posted On 12/7/2005                 Document on Town Hall

This document applies to the following chapters
[4 VAC 25-130] Coal Surface Mining Reclamation Regulations


Back to showing guidance documents for this board

Back to showing guidance documents for this agency