Action Summary Article 8 of 9VAC5 Chapter 80 (Permits for Stationary Sources) applies to the construction or reconstruction of new major stationary sources or major modifications to existing ones in prevention of significant deterioration (PSD) areas. The amendments revise the definition of "regulated NSR pollutant" to remove the term “particulate matter emissions” from the requirement to include the condensable particulate matter fraction. "Particulate matter emissions" refers to the non-criteria indicator for particulate matter (PM) that is regulated under new source performance standards (NSPSs). EPA has determined that only PM10 and PM2.5 may include condensable PM, unless a specific NSPS or applicable implementation plan otherwise requires the condensable portion to be included.
Chapters Affected Only affects this chapter.
Executive Branch Review This Action is exempt from Article 2 of the Administrative Process Act. The normal executive branch review process is not required. As such, it can be submitted directly for publication and is effective upon publication.
Exempt Citation: 2.2-4006 A 3 and A 4 c
RIS Project Yes  [003536]
New Periodic Review This action will not be used to conduct a new periodic review.
 
Stages
Stages associated with this regulatory action.
Stage ID Stage Type Status
6507 Final Stage complete. This regulation became effective on 05/22/2013.
 
Contact Information
Name / Title: Karen G. Sabasteanski 
Address: 1111 East Main Street, Suite 1400
P.O. Box 1105
Richmond, VA 23218
Email Address: karen.sabasteanski@deq.virginia.gov
Phone: (804)659-1973    FAX: ()-    TDD: ()-

This person is the primary contact for this chapter.