Action:
Amend Wasteload Allocations in Section 60 A, 80 A, 80 B, 90 A and 110 A
General Information
Action Summary |
The amendments to the state’s Water Quality Management Planning Regulation (9 VAC 25-720) include adding one new TMDL waste load allocation in the James River Basin (9 VAC 25-720-60 A), ten new TMDL waste load allocations in the Roanoke River Basin (9 VAC 25-720-80 A), one new TMDL waste load allocation in the Tennessee-Big Sandy River Basin (9VAC 25-720-90 A), and three revised TMDL waste load allocations in the Chesapeake Bay – Small Coastal-Eastern Shore River Basin (9 VAC 25-720-110 A). In addition, amendments to the Water Quality Management Planning Regulation (9VAC25-720-80 B) are required to reflect changes to non-TMDL wasteload allocations within the Roanoke River Basin for an expansion of the South Hill WWTP (VPDES Permit No. VA0069337). |
Chapters Affected |
Only affects this chapter.
|
Executive Branch Review |
This Action is exempt from Article 2 of the Administrative Process Act.
The normal executive branch review process is not required. As such, it can be submitted directly for publication and
is effective upon publication.
Exempt Citation:
2.2-4006 A 14 of the Code of Virginia
|
RIS Project |
Yes [005316] |
New Periodic Review |
This action will not be used to conduct a new periodic review.
|
Stages
Stages associated with this regulatory action.
Stage ID |
Stage Type |
Status |
8165
|
Final
|
Stage complete. This regulation became effective on 02/21/2018. |
Contact Information
Name / Title:
|
William Isenberg
|
Address:
|
1111 East Main Street, Suite 1400
P.O. Box 1105
Richmond, VA 23218
|
Email Address:
|
william.isenberg@deq.virginia.gov
|
Phone:
|
(804)698-4228
FAX: ()-
TDD: ()-
|