Virginia Regulatory Town Hall
Agency
Virginia Department of Health
 
Board
State Board of Health
 
chapter
Sewage Handling and Disposal Regulations [12 VAC 5 ‑ 610]
Action Amend Regulations to establish requirements for gravelless material and drip dispersal
Stage Emergency/NOIRA
Comment Period Ended on 2/26/2014
spacer
Previous Comment     Next Comment     Back to List of Comments
2/26/14  12:49 pm
Commenter: James B Slusser, AOSE

12VAC5_610-940.C.7
 

Recommendation

c. Placement and alignment. Pressure percolation lines shall be placed so that the holes face vertically downward upward except the distal hole. All pressure percolation piping shall be placed at the same elevation, unless throttling valves are utilized, and shall be level. The piping shall be placed in the horizontal center of the trench and shall maintain a straight alignment. Normally the invert of the pressure percolation lines shall be placed 8-1/2 inches above the trench bottom. However, under no circumstance shall the invert of the pressure percolation lines be placed closer than 16-1/2 inches to the seasonal water table as defined in 12VAC5-610-950 A 3. When the invert of the pressure percolation lines must be placed at an elevation greater than 8-1/2 inches above the trench bottom, landscaping over the absorption area may be required to provide the two inches of gravel and six inches of fill over the pressure percolation lines required in subdivision 7 a of this subsection.

Justification

  This will help in limiting hydraulic scouring of trench bottom while allowing the line(s) to drain in freezing applications.

CommentID: 31102