Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
Board
State Water Control Board
chapter
Fees for Permits and Certificates [9 VAC 25 ‑ 20]
Action:
Fast track amendment- removal of fees for MS4 and construction activities
Action 5463
 
General Information
Action Summary A periodic review was recently conducted for this regulation and the result of the review was to amend the regulation to remove fees that are no longer needed. This amendment removes fees for Municipal Separate Storm Sewer System (MS4) and Construction Activity permitting fees from this regulation. These fees in 9VAC25-20 are a carryover from when the stormwater program was administered by DEQ prior to the program's transfer to the Department of Conservation and Recreation (DCR) (in January 2005). Permit fees for MS4 and construction activities are assessed under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870) and are no longer needed in 9VAC25-20.
Chapters Affected Only affects this chapter.
Executive Branch Review This action will go through the normal Executive Branch Review process.
RIS Project Yes  [005834]
Result of Prior Periodic Review Filed 3/11/2019
New Periodic Review This action will not be used to conduct a new periodic review.
 
Stages
Stages associated with this regulatory action.
Stage ID Stage Type Status
8869 Fast-Track Stage complete. This regulation became effective on 10/15/2020.
 
Contact Information
Name / Title: Melissa Porterfield 
Address: 1111 East Main Street, Suite 1400
P.O. Box 1105
Richmond, VA 23218
Email Address: melissa.porterfield@deq.virginia.gov
Phone: (803)698-4238    FAX: ()-    TDD: ()-