Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
Board
Air Pollution Control Board
 
chapter
Electric Generator Voluntary Demand Response General Permit [9 VAC 5 ‑ 530]
Chapter is Exempt from Article 2 of the Administrative Process Act
Guidance Documents
Chapter Information
Description A general permit with terms and conditions as may be necessary to form the legally enforceable basis for the implementation of all regulatory and statutory requirements applicable to new and existing minor source emissions units that participate in a voluntary demand response program (i.e. load curtailment, demand response, peak shaving or like program as defined in ยง10.1-1307.02 B 4 of the Code of Virginia.
State Authority Section 10.1-1307.02 B 4 of the Code of Virginia
Federal Authority None entered
Exempt from APA Yes, changes to this chapter of the VA Administrative Code are exempt from Article 2 of the Administrative Process Act.
Exempt Citation: Section 2.2-4006 A 9 of the Code of Virginia
Text of Regulation Link to Virginia Administrative Code
Goals of Regulation Establish requirements for the construction, installation, and operation of distillate oil, natural gas, liquid propane gas, and bio-diesel fired electric generating facilities that participate in a voluntary demand response program (i.e., load curtailment, demand response, peak shaving or like program) and that qualify as non-major facilities under the Clean Air Act.
Meetings See all meetings (6) relating to this chapter.

Contact Information
Name / Title: Tamera Thompson 
Address: 1111 East Main Street, Suite 1400
P.O. Box 1105
Richmond, VA 23218
Email Address: tamera.thompson@deq.virginia.gov
Telephone: (804)698-4502    FAX: ()-    TDD: ()-
Current Actions
Action Title Latest Stage Status
Electronic postmarks (Rev C23) Fast-Track Stage complete. Becomes effective on 04/11/2024.

Past Actions
Action Title Latest Stage Status
Electric Generator Voluntary Demand Response General Permit (Rev. Dg)
Action is Exempt from Article 2 of the Administrative Process Act
Final Stage complete. This regulation became effective on 08/17/2011.

Periodic Reviews
Last Activity Status
3/1/2023 Agency Completed Retain As Is
10/26/2018 Agency Completed Retain As Is